Record the challenger’s progress without relabeling reused development dates as fresh evidence: keep the prior controller and require a new paper-forward test.

MARKET CONTEXT · OUTSIDE MODEL FREEZEHOOD

These readings update independently. They are not model inputs, deployment evidence, or a trading recommendation.

Latest price
$122.11
· fallback
20D momentum
+30.9%
Close-to-close · 20 completed sessions
RSI 14
65.9
neutral · Wilder method
Relative volume
1.2×
Versus the prior 20 completed sessions

TECHNICALS THROUGH · TIMESTAMPED FALLBACK

EXECUTIVE CONCLUSION

Keep the improvement. Do not promote the signal.

Signed Core Ridge records a lower retrospective Brier score and passes calibration-error and fold-consistency gates. Seven gates still fail, and the same 685 dates are development-only. The fold-local prior remains the active controller.

PHASE B CHALLENGERSigned Core Ridge

Selected from three bounded challengers, its Brier is 0.241980, improvement is +0.004739, and AUC is 0.503030. G7 and G8 pass, but the 95% Brier lower bound remains −0.002580.

GUARDRAILED OUTPUTBenchmark only

The fold-local prior stays active at 55.745%. The challenger’s latest 60.40% output is experimental and does not tilt the simulation or become a live signal.

COMPLETE RESEARCH CHAIN

Auditable does not mean deployable.

Three build contracts pass. Phase A is preserved, Phase B records measurable progress, and the incomplete gate result still controls the recommendation.

  1. 01
    Target contract

    Raw HOOD close, five-session horizon.

    PASS
  2. 02
    Market data

    1,255 aligned SIP sessions and explicit clocks.

    PASS
  3. 03
    Feature contract

    60 trailing-only features on a common window.

    PASS
  4. 04
    Phase A replay

    Five candidates; Cross Asset Ridge clears 0 of 9 gates.

    COMPLETE
  5. 05
    Phase B challenger

    Signed Core Ridge clears G7 and G8: 2 of 9.

    PARTIAL
  6. 06
    Evidence boundary

    All 685 dates remain development-only.

    FROZEN
  7. 07
    Recommendation

    Fold-local prior controller; no deployment.

    GUARDED
PHASE A · ORIGINAL DEVELOPMENT SEARCH

Cross Asset Ridge ranks first, but does not validate.

Selection means lowest observed Brier score among the five inspected candidates. It does not override uncertainty, discrimination, or calibration evidence.

BRIER IMPROVEMENT+0.001459

95% block interval −0.002606 to +0.005568.

ROC AUC0.428325

Below the 0.50 no-skill reference.

FLAT THRESHOLD HIT RATE59.708%

Equals the always-up OOS class rate; fold-prior accuracy is 58.102%.

CALIBRATION−1.399

Slope; intercept 0.822 and five-bin ECE 0.111.

DEPLOYMENT GATES0 / 9

Benchmark-only recommendation.

LATEST FROZEN OUTPUTS55.745%

Active prior controller; development candidate is flat at 57.508%.

PHASE B · DEVELOPMENT CHALLENGER

Signed Core Ridge lowers retrospective Brier, not the bar.

The challenger reuses the same 685 dates already examined in Phase A. Its results are development evidence only—not a fresh holdout or deployment test.

BRIER SCORE0.241980

Improvement +0.004739; 95% lower bound −0.002580.

ROC AUC0.503030

Block-bootstrap lower bound 0.4347.

CALIBRATION0.266303

Slope; intercept 0.312902 and five-bin ECE 0.042856.

POSITIVE FOLDS8 / 11

Gate G8 passes with 72.7% of folds positive.

DEPLOYMENT GATES2 / 9

G7 calibration error and G8 fold consistency pass.

LATEST FROZEN OUTPUTS60.40%

Experimental challenger; active prior controller remains 55.745%.

MODEL RECOMMENDATIONS

Protect the next honest test.

The frozen 685 OOS dates are now development evidence. They cannot become a fresh holdout after Phase B tuning.

  1. P0

    Keep the HOOD directional model switched off and use the fold-local prior only.

  2. P1

    Freeze Signed Core Ridge, its target, folds, nine gates, and the current benchmark before another outcome arrives.

  3. P2

    Treat its 2-of-9 result as Phase B development evidence, never independent validation.

  4. P3

    Score the frozen challenger and prior controller side by side on newly arriving paper-forward outcomes.

  5. P4

    Require the new paper-forward period to clear all nine gates before reconsidering deployment.

RECOMMENDATION

Phase B passes G7 and G8, but 2 of 9 gates is insufficient for deployment. Model 2 remains benchmark-only and no-go.

PRIMARY SOURCES

Alpaca consolidated stock bars · Alpaca US crypto bars · Alpaca corporate-action announcements · Robinhood SEC filings · Robinhood investor relations. The Excel file preserves the source ledger and frozen outputs.

NEXTStep 7 · Simulate the range